b.Discussion and / or action regarding the vehicle and trailer permit for Cupps Masonry to haul a foundation system and materials to the Hoban Hill project
g.Discussion with Power Construction Group regarding the scheduled and proposed use of vehicles after May 1st for the Grand Hotel earth retention project
h.Request for approval of the Installation Agreement with the Detroit Institute of Art for the installation of a painting outside the Mackinac Island Public Library
l.Request for approval of a vehicle permit submitted by Grand Traverse Construction to use a vac truck at the Biddle Point Pump Station to clean inground fuel
w.Request for approval of a 37-day extension of (5) vehicle permits submitted by Hoffman Landscaping for continued landscaping work at the Inn at Stonecliffe
z.Request for approval of (2) vehicle permits submitted by Belonga Excavating for the installation of water & sewer at the Hammon’s – Stonecliffe Manor #1, Lot #14
aa.Request for approval of (2) vehicle permits submitted by Belonga Excavating for the installation of water & sewer at the Ledtke residence – 6880 Huron Rd
bb.Request for approval of (3) vehicle & (3) trailer permits submitted by DVM Utilities to repair and correction work at the Yacht Club for AT&T – 7006 Main St.