Bids were received November 15, 2022 with two bids received. Recommend awarding to MSNW Group, the lowest responsive and responsible bidder.
Sumas is assisting surrounding WID's with contracting for ditch cleaning services. City has Interlocal with WID's. What role does City of Lynden want to have?
19 bids were received for this project. The Certified Bid Tabulation will be presented at the meeting.
Information Items
1) Rocks, Gravel, Materials
2) Chemicals
3) Lab Analysis (no bids received)
4) Grease Traps (one bid - Baker Septic, $100/service)
5) Mowing (to be presented at meeting)
6) Pest Control (to be presented at meeting)
East Front Street Stabilization - Emergency Repair - DeKoster - Scheduled to start December 5.
Pepin Creek Main Street Bridge - Interwest - Additional asphalt approach work delayed until 2023. Weather impacts.
Pepin Creek Relocation and Street Infrastructure - Pursuing Federal planning grant ($2M).
West Main Street - Berthusen RAB - CERB funding received ($4.5M), City will use local funds for match. Final agreement and conditions met by May 18, 2023.
South 6th Street CIPP - Iron Horse - Replacing six manhole covers, adding additional coating where pipe failed.
Guide Meridian Pump Station - Colacurcio - Working on gravity sewer main to the west.
South Park Water/Street/Sidewalk Improvements - Strider - Suspended until 2023.
NW Fair and Event Center Stormwater Improvements - DeKoster - Finalizing easement with fairgrounds.
Bradley Road Complete Street Improvement - Seeking Congressional earmark for roundabout.
Cedar Drive Utility and Street Improvements - Street vacation in exchange for Pump Station easement.
8691 Benson Road - Abating asbestos and planned training burn in December or January.
Wastewater Treatment Plant Expansion - SEPA completed, and Engineering Report approved. Waiting to hear results of DOE design grant/loan application in January.
Jim Kaemingk Trail Extension - Depot to 8th - USFW comments received by Army Corps, still waiting for National Marine Fisheries comments. Asking for assistance from lobbyist with Congressional delegation.
Community Center Renovation - Interviews scheduled with two firms on December 8.
Pine Street Bridge - Received $5.5M loan (20 years, 1.39%) from PWTF. (See attached letter)
Review email from resident regarding extended-length truck parking on Front Street.
New Business