OPEN MEETING
TOUR OF POSSIBLE BOND PROJECT SITES
Dietz Elkhorn Roadway Reconstruction Project
Reconstruct Battle Intense near Trailside
Rolling Acres Roadway Reconstruction
Ammann Road Reconstruction
28907 Chartwell Lane - Drainage Channel Erosion Control
8622 Delta Dawn - Drainage Channel Erosion Control
8472 Rolling Acres Trail - Channel & Culvert Improvements
8040 Rolling Acres Trail - Stormwater Channel Construction
7740 Pimlico Lane - Channel & Culvert Improvements
7420 Rolling Acres Trail - Low Water Crossing Improvements
8426 Triple Crown - Culvert Improvements
8312 Triple Crown - Culvert Construction
29314 Sumpter Drive - Swale Construction
32030 Scarteen - Culvert Improvements
Ammann Road Low Water Crossing
8402 Battle Intense Low Water Crossing
31988 Scarteen - Channel Improvements
7644 Pimlico Lane - Runoff Flow
8045 Flagstone Hill - Regrading/Culvert Construction
Fire Station #3 Phase 2 Upgrades
Civic Center - City Hall Campus
City Gateway Feature
Arbors Preserve Access Road
ADJOURNMENT
Requests for City topic needing additional information/research; or, potential consideration for a future agenda
_________________________________________________________________________________________________________________
Signature of Agenda Approval: s/Tobin E. Maples
Tobin E. Maples, City Manager
I, Amanda Valdez, TRMC, Deputy City Secretary, certify that the above Notice of Meeting was posted on the outside bulletin board at the Fair Oaks Ranch City Hall, 7286 Dietz Elkhorn, Fair Oaks Ranch, Texas, and on the City’s website www.fairoaksranchtx.org, both places being convenient and readily accessible to the general public at all times.
As per Texas Government Code 551.045, said Notice was posted by 9:00 AM, MONTH DD, 2022 and remained so posted continuously for at least 72 hours before said meeting was convened.