3.Palmetto Bluff Block M7 (Development Plan): A request by Drew Lonker of Thomas & Hutton, on behalf of Palmetto Bluff Uplands, LLC for approval of a Final Development Plan application. The project consists of general clearing, installation of water and sewer utilities, a sanitary sewer pump station, dry utilities, storm drainage infrastructure and an asphalt roadway to serve the proposed 13 single-family residential lots. The property consists of approximately 27.35 acres identified by tax map number R614 057 000 0217 0000 located within the Palmetto Bluff Planned Unit Development (PUD). (DP-07-24-019259) (Staff - Dan Frazier)