6.Approve revision to funds allocation of Construction Contract to JHC Corporation in the amount of $1,395,854.70 for James Brown Blvd. (Twiggs to Laney Walker Blvd.) Improvements Project (PI# 0013707) for additional road paving & associated construction. Also, authorize and approve reallocating Engineering SPLOST Recaptured amount of $660,524.00 from James Brown Blvd Project (PI#0013707) to Engineering SPLOST Itemized as ADA Sidewalks ($54,317), On-Call Construction ($150,000), Sidewalks ($106,207), & Resurfacing ($350,000). AE/Bid #23-173